I have ADP, but I think the RAPID part is the same. I had this problem too and what I did was put in a 0 (zero) in the fields, with 3 zeros for the PDC and for the date I used T (not sure if EDS does this) for the current date. You should know if its accepted or rejected by the answerback. Its worked for 2 quarters now, but still takes lots of key punching.
[This message has been edited by gully (edited 07-10-2003).]