by waleed030 » Mon Apr 06, 2015 12:34 pm
ADP uses a rolling 9 mth period, so if sales are in mth 1 and 2, and the next is month 9, that is 3 in 9, if sales months 1, 2 and 10, nope, that is 2 sales in the rolling 9. It takes the number and looks back 9 months.